CODE OF PRACTICE FOR SITE SUPERVISION – Typical Items for the Check List of Specific Tasks for AP’s TCPs

Table 5.1 Typical Items for the Check List of Specific Tasks for AP’s TCPs
Description 
Establish systems for co-ordinating, compiling and filing of reports, maintaining filing systems; and forwarding reports to AP in case of non-conformity. 
Check that the hoarding and/or covered walkways are erected to secure safety of the public in accordance with the hoarding plan agreed by the BA. 
Check that the provision and condition of scaffolding, catch fans, matscreens and heavy duty nylon mats, as appropriate, are satisfactory. 
Check that monitoring check points are installed and readings are taken in time. 
Register reports of non-conformity and inform relevant parties of non-conformity. 
Report to the AP if the non-conformity is considered to pose an imminent danger, to be a significant risk or a source of danger or the RC does not comply with rectification instructions. 
Check that all lower grade TCPs and RC’s TCPs are making inspections no less than the required frequency and carrying out duties in accordance with the Technical Memorandum and the Code of Practice for Site Supervision. 
Check and satisfy that copies of approved plans (or submitted plans for minor works), method statements, precautionary and protective measures proposals and  all related drawings are kept on site; and that they are followed, including checking the video record for demolition works. 
Check and monitor that lateral supports are installed in accordance with approved/agreed sequence and not to be removed in advance of adequate propping or restraint. 
  
Any other items considered essential by the AP for the project, including those for quality supervision and other conditions imposed by the BA at approval and/or consent stage. 

Leave a comment